Building Inspections staff require four (4) full sets of plans and four (4) sets of plat showing the distance from the property line for new construction and additions, and two (2) full sets of plans for alterations. In addition to the building permit application(s), documents may be required for planning, zoning and civil engineering. Building permits submitted on or after September 4, 2019, shall comply with the 2015 edition of the Virginia Uniform Statewide Building Code.
Processing Time
Permit Applications and Inspections are processed between 8 am and 3:30 pm
Permit status and inspections can be tracked at this link